Writy.
  • Wind & Solar Energy Portal
  • Solar Energy
  • Solar Panel
  • Wind Energy
  • Wind Turbine
  • Hydroelectric Energy
  • Sea and Marine Energy
  • Solar and Wind Images
No Result
View All Result
Writy.
  • Wind & Solar Energy Portal
  • Solar Energy
  • Solar Panel
  • Wind Energy
  • Wind Turbine
  • Hydroelectric Energy
  • Sea and Marine Energy
  • Solar and Wind Images
No Result
View All Result
Writy.
No Result
View All Result
Aresca announces intent to publish national adoptions of wind energy - ARESCA Unveils Ambitious Plan to Standardize Wind Power Business Practices Nationwide

Aresca announces intent to publish national adoptions of wind energy - ARESCA Unveils Ambitious Plan to Standardize Wind Power Business Practices Nationwide

ARESCA Unveils Ambitious Plan to Standardize Wind Power Business Practices Nationwide

by Marvin Brant
April 14, 2025
in Wind Energy
0

The American Renewable Energy Standards and Certification Association (ARESCA) is informing all currently and significantly impacted parties wishing to acquire additional details or to provide input regarding the acceptance of the upcoming IEC TC 114 and TC 88 standards as American National Standards (ANS):

  • ARESCA 62600-100-202x, Marine energy – Wave, tidal and other water current converters – Part 100: Electricity generating wave energy converters – Power efficiency assessment (identical national adoption of IEC TS 62600-100:2024)
  • ARESCA 62600-101-202x, Marine energy – Wave, tidal and other water current converters – Part 101: Wave energy resource assessment and characterization (identical national adoption of IEC TS 62600-101:2024)
  • ARESCA 62600-103-202x, Marine energy – Wave, tidal and other water current converters – Part 103: Guidelines for the preliminary stage advancement of wave energy converters – Best practices and recommended protocols for the evaluation of pre-prototype devices (identical national adoption of IEC TS 62600-103:2024)
  • ARESCA 62600-200-202x, Marine energy – Wave, tidal and other water current converters – Part 200: Electricity generating tidal energy converters – Power efficiency assessment (identical national adoption of IEC TS 62600-200:2025)
  • ARESCA 62600-201-202x, Marine energy – Wave, tidal and other water current converters – Part 201: Tidal energy resource assessment and characterization (identical national adoption of IEC TS 62600-201:2025)
  • ARESCA 61400-16-202x, Wind energy generation systems – Part 16: Standard file format for exchanging power curve data (identical national adoption of IEC 61400-16:2027)
  • ARESCA 61400-32-202x, Amendment 1 – Wind energy generation systems – Part 32: Operations and maintenance of blades (identical national adoption of IEC 61400-36:2026)
  • ARESCA 61400-40-202x, Wind energy generation systems – Part 40: Electromagnetic Compatibility (EMC) – Requirements and testing methods (identical national adoption of IEC 61400-40:2025)

If you wish to receive further information or to provide feedback, kindly convey your interest by April 6, 2025, to George Kelly, the ARESCA Secretary via email (secretary@aresca.us).

News item from ARESCA


Filed Under: News

 

You might also like

Energizing GB: Crafting a Cutting-Edge Tech Strategy

Energizing GB: Crafting a Cutting-Edge Tech Strategy

June 24, 2025
Dajin heavy industry rolls out first inch cape monopiles - Dajin Heavy Industry Unveils Groundbreaking Inch Cape Monopiles

Dajin Heavy Industry Unveils Groundbreaking Inch Cape Monopiles

June 16, 2025

Marvin Brant

Related Stories

Energizing GB: Crafting a Cutting-Edge Tech Strategy

Energizing GB: Crafting a Cutting-Edge Tech Strategy

by Marvin Brant
June 24, 2025
0

GB Energy must formulate a technology-centric strategy if it aims to achieve its long-term goal of becoming a fully operational...

Dajin heavy industry rolls out first inch cape monopiles - Dajin Heavy Industry Unveils Groundbreaking Inch Cape Monopiles

Dajin Heavy Industry Unveils Groundbreaking Inch Cape Monopiles

by Marvin Brant
June 16, 2025
0

Dajin Heavy Industry has manufactured the initial three monopiles for the Inch Cape offshore wind farm, the firm announced on...

Us government allows empire wind offshore project to resume construction - "Empire Wind Project Set to Soar: U.S. Government Greenlights Offshore Construction Resume"

“Empire Wind Project Set to Soar: U.S. Government Greenlights Offshore Construction Resume”

by Marvin Brant
June 7, 2025
0

Empire Offshore Wind, a division of Equinor ASA, has been notified by the Dept. of the Interior’s Bureau of Ocean...

The outlook for energy m a amid global tariff war - Navigating the Energy M&A Landscape in the Era of Global Tariff Turmoil

Navigating the Energy M&A Landscape in the Era of Global Tariff Turmoil

by Marvin Brant
May 28, 2025
0

The ambiguity surrounding the international tariff conflict is altering the framework of mergers and acquisitions (M&A) within the energy realm....

Next Post
Hydrogen - TotalEnergies Sets Sail for Green Horizons with RWE's Inexperienced Hydrogen Deal

TotalEnergies Sets Sail for Green Horizons with RWE's Inexperienced Hydrogen Deal

Windy

News About Solar System And Turbine Winds

  • Privacy Policy
  • Contact Us

© 2022-2023 | WindySolar.com

No Result
View All Result
  • Wind & Solar Energy Portal
  • Solar Energy
  • Solar Panel
  • Wind Energy
  • Wind Turbine
  • Hydroelectric Energy
  • Sea and Marine Energy
  • Solar and Wind Images

© 2022-2023 | WindySolar.com