Studying Time: 1 minutes
Vestas has introduced a brand new order as a part of its Q1 consumption, securing a 62 MW contract from MIBRAG GmbH, a subsidiary of Energetický a průmyslový holding (EPH). The challenge, named Profen II, will probably be situated in Saxony and Saxony-Anhalt, Germany. This marks Vestas’ second order in Germany this month, following the contract for the Bahren West II wind challenge in Brandenburg.
The Profen II wind farm will characteristic 10 V162-6.2 MW generators, identified for his or her excessive effectivity and efficiency. Vestas will present long-term assist by way of a 20-year AOM5000 Service Settlement, making certain optimum operation and upkeep.
Turbine supply is scheduled to start in Q1 2026, with commissioning anticipated in Q1 2027. This challenge highlights Vestas’ dedication to advancing Germany’s renewable power capability and supporting the area’s transition to sustainable energy.